Altmouth Roof Refurbishment
GHB Ltd were commissioned to replace flat roof covering and associated works to a flat roof at the DEFRA Altmouth Pumping Station. Works to include stripping of the original ballast and existing roof covering, upgrade of the roof insulation, removal of former skylight, cover. The new roof covering is a Garland UK Stress Ply Signature – Bituminous Waterproofing Warm Roof System 30 Year Single Point. A new floodlighting system, perimeter guardrail, and new lighting protection system was installed.
Client
Name here
Date Completed
03/03/2023
Scope
Roof stripping, Roof Insulation, Garland UK roof coverings, M&E, Handrail protection.