Altmouth Roof Refurbishment

GHB Ltd were commissioned to replace flat roof covering and associated works to a flat roof at the DEFRA Altmouth Pumping Station. Works to include stripping of the original ballast and existing roof covering, upgrade of the roof insulation, removal of former skylight, cover. The new roof covering is a Garland UK Stress Ply Signature – Bituminous Waterproofing Warm Roof System 30 Year Single Point. A new floodlighting system, perimeter guardrail, and new lighting protection system was installed.

Client
Name here

Date Completed
03/03/2023

Scope
Roof stripping, Roof Insulation, Garland UK roof coverings, M&E, Handrail protection.

Previous
Previous

Peterborough Office

Next
Next

Wildwood Building Office Refurbishment, Worcester